240 kW / 418 kWh PV–Storage–Diesel EV Charging Project for a Mining Site in Chile
A dual-gun integrated charging and battery energy storage system supporting mining vehicle charging and carport power supply.

Project Overview
AINEGY supplied a 240 kW / 418 kWh dual-gun EV charging BESS for a mining application in Chile in 2024. The system combines charging, battery storage and hybrid energy inputs in one integrated platform.
The PV–storage–diesel configuration supports vehicle charging and carport power supply within an industrial mining environment.
System Highlights
- 240 kW DC charging power
- 418 kWh battery energy capacity
- Two charging guns
- PV–storage–diesel energy integration
- DC-coupled storage and charging architecture
- Integrated EMS and configurable charging interfaces

Project-Configured DC-Coupled PV Storage Charging System
Hybrid EV charging platform integrating battery storage, PV, diesel or grid inputs and dual charging outputs.
Explore Product Range →Planning a Mining or Remote Fleet Charging Project?
Submit your vehicle types, charging schedule, available grid or diesel power, solar capacity and site conditions for a project-configured charging system assessment.




