Hybrid Microgrid Project Experience

Hybrid Microgrid & Remote Power Projects

Explore AINEGY solar-diesel battery energy storage projects for factories, water infrastructure and remote industrial power applications.

Solar–Diesel–BESSModular Parallel CabinetsMW-Scale Containerized StorageFactory PowerWater Infrastructure
AINEGY hybrid microgrid and remote power projects using solar diesel and battery energy storage systems
Factory and Infrastructure Hybrid Energy Projects
CambodiaManufacturing2024

Parallel Solar-Diesel BESS Cabinets for Factory Power in Cambodia

Multiple 215 kWh / 100 kW hybrid energy storage cabinets configured for parallel operation in a factory application.

Parallel AINEGY solar-diesel BESS cabinets installed for a factory power project in Cambodia
AINEGY solar-diesel hybrid BESS cabinets operating in parallel at the Cambodian factory project.
Project LocationCambodia
ApplicationFactory Power Supply
System Rating100 kW / 215 kWh per Unit
System FormMultiple Units in Parallel

Project Overview

AINEGY supplied multiple integrated solar-diesel hybrid BESS cabinets for a factory project in Cambodia. Each cabinet combines LiFePO4 battery storage, power conversion and energy management in a modular platform.

The parallel configuration expands system power and battery capacity while retaining a cabinet-based layout for factory installation.

System Highlights

  • 100 kW / 215 kWh integrated cabinet units
  • Multiple-unit parallel operation
  • Integrated BMS, PCS and EMS
  • Solar and diesel energy coordination
  • Integrated thermal management
  • Integrated fire-protection system
AINEGY Solar-Diesel-BESS Integrated Cabinet
Related Product

Solar-Diesel-BESS Integrated Cabinet

Modular integrated platform for factory, weak-grid and hybrid-energy applications.

View Product Details →

Planning a Modular Factory Energy Project?

Submit your factory load, solar capacity, generator information and operating requirements for a cabinet-based hybrid energy storage assessment.

MauritaniaWater Infrastructure2024

1 MW / 2 MWh Solar-Diesel BESS for a Water Plant in Mauritania

A 20-foot containerized hybrid energy storage system supporting PV-storage-diesel power for water-treatment and pumping applications.

AINEGY 1 MW 2 MWh solar-diesel BESS container installed for a water plant project in Mauritania
AINEGY 1 MW / 2 MWh containerized BESS supplied for the Mauritania water infrastructure project.
Project LocationMauritania, West Africa
ApplicationWater Plant Power Supply
System Rating1 MW / 2 MWh
Product Form20-Foot Container

Project Overview

AINEGY supplied a 1 MW / 2 MWh containerized battery energy storage system for a water plant project in Mauritania.

The system forms part of a PV-storage-diesel power architecture supporting water-treatment, pumping and associated facility loads through centralized energy management.

System Highlights

  • 1 MW battery power platform
  • 2 MWh battery energy capacity
  • 20-foot containerized integration
  • PV, BESS and diesel coordination
  • Water-treatment and pumping load support
  • Integrated EMS and thermal management
AINEGY configured containerized hybrid BESS
Related Product

Configured Containerized Hybrid BESS

Project-configured container platform for water, mining and industrial hybrid power applications.

View Product Details →

Planning a Water Infrastructure Energy Project?

Submit your pumping loads, treatment-process demand, solar capacity, generator information and operating requirements for a containerized hybrid BESS assessment.

Hybrid Microgrid Products for Different Project Scales

AINEGY provides integrated solar-diesel BESS platforms from modular C&I cabinets to MW/MWh-scale containerized systems. Select the platform according to site load, backup duration, solar capacity, generator configuration and expansion requirements.

Cabinet or Containerized Hybrid BESS?

Choose the product form after reviewing peak load, daily energy, installation space, solar and generator capacity, backup duration and future expansion. Cabinet systems suit modular projects; containerized systems suit centralized MW/MWh-scale integration.

Modular or phased capacity expansionParallel Integrated Cabinets
Typical 100–500 kW project scaleC&I PVDG BESS Cabinet
Distributed equipment placementCabinet Platform
MW/MWh-scale centralized projectContainerized BESS
Transport, lifting and project-level integrationContainerized Platform
Longer battery durationHigher-Energy Container

Planning a Hybrid Microgrid or Remote Power Project?

Send your load profile, grid information, solar capacity, generator rating, required operating modes and project location. AINEGY will evaluate the applicable cabinet or container architecture, BESS power, battery capacity and control strategy.