Parallel Solar-Diesel BESS Cabinets for Factory Power in Cambodia
Multiple 215 kWh / 100 kW hybrid energy storage cabinets configured for parallel operation in a factory application.

Project Overview
AINEGY supplied multiple integrated solar-diesel hybrid BESS cabinets for a factory project in Cambodia. Each cabinet combines LiFePO4 battery storage, power conversion and energy management in a modular platform.
The parallel configuration expands system power and battery capacity while retaining a cabinet-based layout for factory installation.
System Highlights
- 100 kW / 215 kWh integrated cabinet units
- Multiple-unit parallel operation
- Integrated BMS, PCS and EMS
- Solar and diesel energy coordination
- Integrated thermal management
- Integrated fire-protection system

Solar-Diesel-BESS Integrated Cabinet
Modular integrated platform for factory, weak-grid and hybrid-energy applications.
View Product Details →Planning a Modular Factory Energy Project?
Submit your factory load, solar capacity, generator information and operating requirements for a cabinet-based hybrid energy storage assessment.






