AINEGY Logo
Event Highlights

AINEGY Debuts Solar-Diesel BESS at IIW Indonesia 2026

AINEGY showcased solar-diesel BESS, C&I energy storage, residential ESS and lithium battery solutions at IIW Indonesia 2026 in Jakarta.

Event Status
Completed
Event Date
June 3–6, 2026
Location
Jakarta International Expo · Jakarta · Indonesia
Hall & Booth
Booth C2G110
AINEGY Debuts Solar-Diesel BESS at IIW Indonesia 2026

Jakarta, Indonesia — AINEGY participated in the 11th International Industrial Week Indonesia 2026, held from June 3 to 6 at Jakarta International Expo.

At Booth C2G110, AINEGY presented energy storage solutions for residential, commercial and industrial, weak-grid and off-grid applications. The exhibition provided an opportunity to discuss project requirements, product selection and local cooperation with customers, EPC contractors and distribution
partners.

AINEGY presented its energy storage portfolio at IIW Indonesia 2026.

Energy Storage Solutions Presented at IIW Indonesia 2026

Residential Energy Storage Systems

AINEGY presented wall-mounted, stackable and portable residential energy storage systems supporting solar and grid charging.

The systems are designed to provide backup power during grid interruptions and support residential and small commercial energy requirements.

AINEGY residential energy storage system at IIW Indonesia 2026

Electric Three-Wheeler Lithium Batteries

AINEGY also presented lithium battery solutions developed for electric three-wheelers and other light electric vehicles.

The battery systems are designed for operating conditions requiring temperature resistance, cycle life and more reliable performance than conventional lead-acid batteries.

Commercial and Industrial Energy Storage

For factories, commercial buildings and industrial sites, AINEGY presented scalable rack-mounted battery systems that can be configured for larger energy storage capacities.

Typical applications include peak-demand management, solar self-consumption, backup power and the reduction of production interruptions caused by grid outages.

AINEGY commercial and industrial energy storage system
at IIW Indonesia 2026

Solar-Diesel BESS Microgrid

A key exhibit was AINEGY’s solar-diesel battery energy storage microgrid solution.

The system coordinates photovoltaic generation, battery storage, electrical loads and dieselgenerators.It is intended for mines, islands, resorts, remote industrial sites and other applications affected by weak-grid or off-grid conditions.

By prioritizing solar generation and stored energy, the system can reduce diesel-generator operating hours and fuel consumption while improving power continuity.

AINEGY solar-diesel BESS microgrid presented in Jakarta

Solutions for Weak-Grid and Off-Grid Applications

During the event, the AINEGY team discussed energy storage requirements associated with unstable utility grids, remote industrial sites, island power systems and high diesel fuel costs.

Project discussions covered load assessment, solar generation, battery capacity, power-conversion requirements, diesel generator coordination and operating strategies.

Event Highlights

Throughout IIW Indonesia 2026, AINEGY met with industrial customers, EPC companies, renewable energy distributors and potential cooperation partners.

The discussions focused on commercial and industrial battery storage, hybrid microgrids, residential energy storage and localized project support for the Indonesian marketAbout AINEGY

About AINEGY

AINEGY specializes in the development and manufacturing of battery energy storage systems for residential, commercial, industrial, microgrid and special power applications.

The company provides integrated energy storage products and project support for customers and partners in international markets.

Planning an Energy Storage Project in Indonesia?

Contact AINEGY to discuss load requirements, solar generation, battery capacity, system architecture, product selection or local cooperation.

Contact AINEGY

Meet the AINEGY Team

Discuss the event, your energy storage application, project requirements or cooperation plans.